{"id":72239,"date":"2021-01-20T15:57:47","date_gmt":"2021-01-20T14:57:47","guid":{"rendered":"https:\/\/energipole.com\/des-avancees-continues-sur-les-installations-denergipole-esperance\/"},"modified":"2025-10-30T16:52:23","modified_gmt":"2025-10-30T15:52:23","slug":"continuous-progress-at-energipole-esperance-facilities","status":"publish","type":"post","link":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/","title":{"rendered":"Continuous progress at Energipole Esp\u00e9rance facilities"},"content":{"rendered":"<div>\n<h4><strong>Increased leachate treatment capacity and biogas recovery<\/strong><\/h4>\n<\/div>\n<div>\n<p>At the<span class=\"apple-converted-space\">\u00a0<\/span><strong>Energipole Esp\u00e9rance<\/strong><span class=\"apple-converted-space\">\u00a0<\/span>site in Guadeloupe, progress continues in<span class=\"apple-converted-space\">\u00a0<\/span><strong>leachate treatment<\/strong><span class=\"apple-converted-space\">\u00a0<\/span>and<span class=\"apple-converted-space\">\u00a0<\/span><strong>biogas recovery<\/strong>.<br \/>\nLate 2020 saw the commissioning of a second leachate treatment unit, along with a significant upgrade to the biogas engine, now delivering<span class=\"apple-converted-space\">\u00a0<\/span><strong>1 MW of power<\/strong>.<\/p>\n<\/div>\n<div>\n<h4><strong>A high-performance new treatment unit<\/strong><\/h4>\n<\/div>\n<div>\n<p>Commissioned in December 2020, the semi-mobile treatment station has a<span class=\"apple-converted-space\">\u00a0<\/span><strong>nominal capacity of 5 m\u00b3\/h<\/strong>.<br \/>\nInstalled inside two adjoining shipping containers, it features<span class=\"apple-converted-space\">\u00a0<\/span><strong>five successive treatment stages<\/strong><span class=\"apple-converted-space\">\u00a0<\/span>to ensure optimal purification:<\/p>\n<\/div>\n<div>\n<p>1\ufe0f\u20e3<span class=\"apple-converted-space\">\u00a0<\/span><strong>Biological treatment<\/strong><span class=\"apple-converted-space\">\u00a0<\/span>with forced aeration in the storage basin, supported by two new 22 kWh aerators \u2014 tripling aeration capacity<br \/>\n2\ufe0f\u20e3<span class=\"apple-converted-space\">\u00a0<\/span><strong>Lamella settling<\/strong><span class=\"apple-converted-space\">\u00a0<\/span>to separate suspended solids (TSS)<br \/>\n3\ufe0f\u20e3<span class=\"apple-converted-space\">\u00a0<\/span><strong>Disc filtration (55 \u00b5m)<\/strong><span class=\"apple-converted-space\">\u00a0<\/span>to capture remaining TSS<br \/>\n4\ufe0f\u20e3<span class=\"apple-converted-space\">\u00a0<\/span><strong>Ultrafiltration membranes<\/strong><span class=\"apple-converted-space\">\u00a0<\/span>to remove fine particles, part of the organic load and some heavy components<br \/>\n5\ufe0f\u20e3<span class=\"apple-converted-space\">\u00a0<\/span><strong>Reverse osmosis<\/strong>, ensuring near-complete removal of organic compounds, metals and minerals for an output quality close to demineralised water<\/p>\n<\/div>\n<div>\n<p>Together with the existing installation, this upgrade has<span class=\"apple-converted-space\">\u00a0<\/span><strong>significantly increased total leachate treatment capacity<\/strong>.<\/p>\n<\/div>\n<div>\n<h4><strong><span lang=\"NL-BE\">Enhanced energy production<\/span><\/strong><\/h4>\n<\/div>\n<div>\n<p><span lang=\"NL-BE\">In parallel, in September 2020, Energipole Esp\u00e9rance completed the<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">biogas network loop<\/span><\/strong><span lang=\"NL-BE\">, reducing network depression, lowering oxygen content and improving methane capture.<\/span><\/p>\n<\/div>\n<div>\n<p>The result:<span class=\"apple-converted-space\">\u00a0<\/span><strong>higher-quality biogas<\/strong>, engine power increased to<span class=\"apple-converted-space\">\u00a0<\/span><strong>1 MW<\/strong>, and a<span class=\"apple-converted-space\">\u00a0<\/span><strong>more than 60% rise in electricity production<\/strong><span class=\"apple-converted-space\">\u00a0<\/span>since late 2020.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>Increased leachate treatment capacity and biogas recovery At the\u00a0Energipole Esp\u00e9rance\u00a0site in Guadeloupe, progress continues in\u00a0leachate treatment\u00a0and\u00a0biogas recovery. Late 2020 saw the commissioning of a second leachate treatment unit, along with a significant upgrade to the biogas engine, now delivering\u00a01 MW of power. A high-performance new treatment unit Commissioned in December 2020, the semi-mobile treatment station [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":71950,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[41],"tags":[],"class_list":["post-72239","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energipole-antilles-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Continuous progress at Energipole Esp\u00e9rance facilities | Energipole<\/title>\n<meta name=\"description\" content=\"Energipole Esp\u00e9rance upgrades its facilities in Guadeloupe: new leachate treatment unit and over 60% increase in biogas electricity production.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Continuous progress at Energipole Esp\u00e9rance facilities | Energipole\" \/>\n<meta property=\"og:description\" content=\"Energipole Esp\u00e9rance upgrades its facilities in Guadeloupe: new leachate treatment unit and over 60% increase in biogas electricity production.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/\" \/>\n<meta property=\"og:site_name\" content=\"Energipole\" \/>\n<meta property=\"article:published_time\" content=\"2021-01-20T14:57:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-10-30T15:52:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Article_esperance-lixiviats-.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"800\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Johanna\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Johanna\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/\"},\"author\":{\"name\":\"Johanna\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/person\\\/e60fd15cee4f5029eda89cdc7b9594c4\"},\"headline\":\"Continuous progress at Energipole Esp\u00e9rance facilities\",\"datePublished\":\"2021-01-20T14:57:47+00:00\",\"dateModified\":\"2025-10-30T15:52:23+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/\"},\"wordCount\":213,\"publisher\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Article_esperance-lixiviats-.jpg\",\"articleSection\":[\"Energipole Antilles\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/\",\"url\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/\",\"name\":\"Continuous progress at Energipole Esp\u00e9rance facilities | Energipole\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Article_esperance-lixiviats-.jpg\",\"datePublished\":\"2021-01-20T14:57:47+00:00\",\"dateModified\":\"2025-10-30T15:52:23+00:00\",\"description\":\"Energipole Esp\u00e9rance upgrades its facilities in Guadeloupe: new leachate treatment unit and over 60% increase in biogas electricity production.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Article_esperance-lixiviats-.jpg\",\"contentUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Article_esperance-lixiviats-.jpg\",\"width\":1200,\"height\":800},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/continuous-progress-at-energipole-esperance-facilities\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/energipole.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Continuous progress at Energipole Esp\u00e9rance facilities\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energipole.com\\\/en\\\/\",\"name\":\"Energipole\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energipole.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#organization\",\"name\":\"Energipole\",\"url\":\"https:\\\/\\\/energipole.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ENERGIPOLE-dark.svg\",\"contentUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ENERGIPOLE-dark.svg\",\"width\":1,\"height\":1,\"caption\":\"Energipole\"},\"image\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/be.linkedin.com\\\/company\\\/energipole\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/person\\\/e60fd15cee4f5029eda89cdc7b9594c4\",\"name\":\"Johanna\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Continuous progress at Energipole Esp\u00e9rance facilities | Energipole","description":"Energipole Esp\u00e9rance upgrades its facilities in Guadeloupe: new leachate treatment unit and over 60% increase in biogas electricity production.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/","og_locale":"en_US","og_type":"article","og_title":"Continuous progress at Energipole Esp\u00e9rance facilities | Energipole","og_description":"Energipole Esp\u00e9rance upgrades its facilities in Guadeloupe: new leachate treatment unit and over 60% increase in biogas electricity production.","og_url":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/","og_site_name":"Energipole","article_published_time":"2021-01-20T14:57:47+00:00","article_modified_time":"2025-10-30T15:52:23+00:00","og_image":[{"width":1200,"height":800,"url":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Article_esperance-lixiviats-.jpg","type":"image\/jpeg"}],"author":"Johanna","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Johanna","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/#article","isPartOf":{"@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/"},"author":{"name":"Johanna","@id":"https:\/\/energipole.com\/en\/#\/schema\/person\/e60fd15cee4f5029eda89cdc7b9594c4"},"headline":"Continuous progress at Energipole Esp\u00e9rance facilities","datePublished":"2021-01-20T14:57:47+00:00","dateModified":"2025-10-30T15:52:23+00:00","mainEntityOfPage":{"@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/"},"wordCount":213,"publisher":{"@id":"https:\/\/energipole.com\/en\/#organization"},"image":{"@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/#primaryimage"},"thumbnailUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Article_esperance-lixiviats-.jpg","articleSection":["Energipole Antilles"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/","url":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/","name":"Continuous progress at Energipole Esp\u00e9rance facilities | Energipole","isPartOf":{"@id":"https:\/\/energipole.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/#primaryimage"},"image":{"@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/#primaryimage"},"thumbnailUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Article_esperance-lixiviats-.jpg","datePublished":"2021-01-20T14:57:47+00:00","dateModified":"2025-10-30T15:52:23+00:00","description":"Energipole Esp\u00e9rance upgrades its facilities in Guadeloupe: new leachate treatment unit and over 60% increase in biogas electricity production.","breadcrumb":{"@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/#primaryimage","url":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Article_esperance-lixiviats-.jpg","contentUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Article_esperance-lixiviats-.jpg","width":1200,"height":800},{"@type":"BreadcrumbList","@id":"https:\/\/energipole.com\/en\/continuous-progress-at-energipole-esperance-facilities\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/energipole.com\/en\/"},{"@type":"ListItem","position":2,"name":"Continuous progress at Energipole Esp\u00e9rance facilities"}]},{"@type":"WebSite","@id":"https:\/\/energipole.com\/en\/#website","url":"https:\/\/energipole.com\/en\/","name":"Energipole","description":"","publisher":{"@id":"https:\/\/energipole.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energipole.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/energipole.com\/en\/#organization","name":"Energipole","url":"https:\/\/energipole.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energipole.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/08\/ENERGIPOLE-dark.svg","contentUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/08\/ENERGIPOLE-dark.svg","width":1,"height":1,"caption":"Energipole"},"image":{"@id":"https:\/\/energipole.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/be.linkedin.com\/company\/energipole"]},{"@type":"Person","@id":"https:\/\/energipole.com\/en\/#\/schema\/person\/e60fd15cee4f5029eda89cdc7b9594c4","name":"Johanna"}]}},"_links":{"self":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts\/72239","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/comments?post=72239"}],"version-history":[{"count":1,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts\/72239\/revisions"}],"predecessor-version":[{"id":72240,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts\/72239\/revisions\/72240"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/media\/71950"}],"wp:attachment":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/media?parent=72239"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/categories?post=72239"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/tags?post=72239"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}