{"id":72331,"date":"2025-04-25T16:32:20","date_gmt":"2025-04-25T14:32:20","guid":{"rendered":"https:\/\/energipole.com\/avant-apres-une-friche-industrielle-transformee-a-loriol-sur-drome\/"},"modified":"2025-11-03T15:57:30","modified_gmt":"2025-11-03T14:57:30","slug":"before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome","status":"publish","type":"post","link":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/","title":{"rendered":"Before \/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me"},"content":{"rendered":"<div>\n<h4><strong>A transformed site in Loriol-sur-Dr\u00f4me<\/strong><\/h4>\n<\/div>\n<div>\n<p><a href=\"https:\/\/www.energipole-remediation.fr\" target=\"_blank\" rel=\"noopener\">Energipole Remediation<\/a> has completed the<span class=\"apple-converted-space\">\u00a0<\/span><strong>security works on the former LOMA Environnement site<\/strong><span class=\"apple-converted-space\">\u00a0<\/span>in<span class=\"apple-converted-space\">\u00a0<\/span><strong>Loriol-sur-Dr\u00f4me (26)<\/strong>, on behalf of<span class=\"apple-converted-space\">\u00a0<\/span><a href=\"https:\/\/www.ademe.fr\" target=\"_blank\" rel=\"noopener\"><strong>ADEME<\/strong><\/a><span class=\"apple-converted-space\">\u00a0<\/span>and in accordance with the Prefectural enforcement order.<\/p>\n<\/div>\n<div>\n<p><span lang=\"NL-BE\">In<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">under four months<\/span><\/strong><span lang=\"NL-BE\">, our specialist teams sorted, removed and recovered<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">over 30,000 m\u00b3 of hazardous and non-hazardous waste<\/span><\/strong><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><span lang=\"NL-BE\">stored inside buildings, which posed a<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">high fire risk<\/span><\/strong><span lang=\"NL-BE\">.<\/span><\/p>\n<\/div>\n<div>\n<h4><strong><span lang=\"NL-BE\">Concrete and measurable results<\/span><\/strong><\/h4>\n<\/div>\n<div>\n<p><span lang=\"NL-BE\">A total of<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">11,330 tonnes of waste<\/span><\/strong><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><span lang=\"NL-BE\">were handled, with<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">nearly 50% recovered<\/span><\/strong><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><span lang=\"NL-BE\">through<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">granulometric and density-based sorting<\/span><\/strong><span lang=\"NL-BE\">:<\/span><\/p>\n<\/div>\n<div>\n<p><span lang=\"NL-BE\">\u2705<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">35% material recovery<\/span><\/strong><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><span lang=\"NL-BE\">(wood, plastics, cardboard, mineral waste)<br \/>\n<\/span><span lang=\"NL-BE\">\u2705<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">15% energy recovery<\/span><\/strong><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><span lang=\"NL-BE\">(Solid Recovered Fuel \u2013 SRF)<\/span><\/p>\n<\/div>\n<div>\n<p><span lang=\"NL-BE\">These results demonstrate Energipole Remediation\u2019s strong<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">technical and environmental performance<\/span><\/strong><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><span lang=\"NL-BE\">in the<\/span><span class=\"apple-converted-space\"><span lang=\"NL-BE\">\u00a0<\/span><\/span><strong><span lang=\"NL-BE\">responsible management of industrial brownfields<\/span><\/strong><span lang=\"NL-BE\">.<\/span><\/p>\n<\/div>\n<div>\n<h4><strong><span lang=\"NL-BE\">Before \/ After: a secured and reclaimed site<\/span><\/strong><\/h4>\n<\/div>\n\n\t\t<style type=\"text\/css\">\n\t\t\t#gallery-1 {\n\t\t\t\tmargin: auto;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-item {\n\t\t\t\tfloat: left;\n\t\t\t\tmargin-top: 10px;\n\t\t\t\ttext-align: center;\n\t\t\t\twidth: 50%;\n\t\t\t}\n\t\t\t#gallery-1 img {\n\t\t\t\tborder: 2px solid #cfcfcf;\n\t\t\t}\n\t\t\t#gallery-1 .gallery-caption {\n\t\t\t\tmargin-left: 0;\n\t\t\t}\n\t\t\t\/* see gallery_shortcode() in wp-includes\/media.php *\/\n\t\t<\/style>\n\t\t<div id='gallery-1' class='gallery galleryid-72331 gallery-columns-2 gallery-size-large'><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-avant-1024x768.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-avant-1024x768.jpg 1024w, https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-avant-980x735.jpg 980w, https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-avant-480x360.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/>\n\t\t\t<\/dt><\/dl><dl class='gallery-item'>\n\t\t\t<dt class='gallery-icon landscape'>\n\t\t\t\t<img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" src=\"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres-1-1024x768.jpg\" class=\"attachment-large size-large\" alt=\"\" srcset=\"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres-1-1024x768.jpg 1024w, https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres-1-980x735.jpg 980w, https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres-1-480x360.jpg 480w\" sizes=\"(min-width: 0px) and (max-width: 480px) 480px, (min-width: 481px) and (max-width: 980px) 980px, (min-width: 981px) 1024px, 100vw\" \/>\n\t\t\t<\/dt><\/dl><br style=\"clear: both\" \/>\n\t\t<\/div>\n\n<div>\n<p>Thanks to this fast and expertly managed intervention, Energipole Remediation once again proves its ability to act efficiently on<span class=\"apple-converted-space\">\u00a0<\/span><strong>complex sites<\/strong>, combining<span class=\"apple-converted-space\">\u00a0<\/span><strong>safety, resource recovery and sustainable outcomes<\/strong>.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>A transformed site in Loriol-sur-Dr\u00f4me Energipole Remediation has completed the\u00a0security works on the former LOMA Environnement site\u00a0in\u00a0Loriol-sur-Dr\u00f4me (26), on behalf of\u00a0ADEME\u00a0and in accordance with the Prefectural enforcement order. In\u00a0under four months, our specialist teams sorted, removed and recovered\u00a0over 30,000 m\u00b3 of hazardous and non-hazardous waste\u00a0stored inside buildings, which posed a\u00a0high fire risk. Concrete and measurable [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":71983,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[44],"tags":[],"class_list":["post-72331","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energipole-remediation-en"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Before \/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me | Energipole<\/title>\n<meta name=\"description\" content=\"Energipole Remediation secures the LOMA brownfield in Loriol-sur-Dr\u00f4me for ADEME: 11,330 tonnes of waste treated, 50% recovered in under four months.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Before \/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me | Energipole\" \/>\n<meta property=\"og:description\" content=\"Energipole Remediation secures the LOMA brownfield in Loriol-sur-Dr\u00f4me for ADEME: 11,330 tonnes of waste treated, 50% recovered in under four months.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/\" \/>\n<meta property=\"og:site_name\" content=\"Energipole\" \/>\n<meta property=\"article:published_time\" content=\"2025-04-25T14:32:20+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-03T14:57:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Johanna\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Johanna\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/\"},\"author\":{\"name\":\"Johanna\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/person\\\/e60fd15cee4f5029eda89cdc7b9594c4\"},\"headline\":\"Before \\\/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me\",\"datePublished\":\"2025-04-25T14:32:20+00:00\",\"dateModified\":\"2025-11-03T14:57:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/\"},\"wordCount\":163,\"publisher\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Loriol-apres.jpg\",\"articleSection\":[\"Energipole Rem\u00e9diation\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/\",\"url\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/\",\"name\":\"Before \\\/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me | Energipole\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Loriol-apres.jpg\",\"datePublished\":\"2025-04-25T14:32:20+00:00\",\"dateModified\":\"2025-11-03T14:57:30+00:00\",\"description\":\"Energipole Remediation secures the LOMA brownfield in Loriol-sur-Dr\u00f4me for ADEME: 11,330 tonnes of waste treated, 50% recovered in under four months.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Loriol-apres.jpg\",\"contentUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/10\\\/Loriol-apres.jpg\",\"width\":1200,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/energipole.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Before \\\/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energipole.com\\\/en\\\/\",\"name\":\"Energipole\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energipole.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#organization\",\"name\":\"Energipole\",\"url\":\"https:\\\/\\\/energipole.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ENERGIPOLE-dark.svg\",\"contentUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ENERGIPOLE-dark.svg\",\"width\":1,\"height\":1,\"caption\":\"Energipole\"},\"image\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/be.linkedin.com\\\/company\\\/energipole\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/person\\\/e60fd15cee4f5029eda89cdc7b9594c4\",\"name\":\"Johanna\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Before \/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me | Energipole","description":"Energipole Remediation secures the LOMA brownfield in Loriol-sur-Dr\u00f4me for ADEME: 11,330 tonnes of waste treated, 50% recovered in under four months.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/","og_locale":"en_US","og_type":"article","og_title":"Before \/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me | Energipole","og_description":"Energipole Remediation secures the LOMA brownfield in Loriol-sur-Dr\u00f4me for ADEME: 11,330 tonnes of waste treated, 50% recovered in under four months.","og_url":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/","og_site_name":"Energipole","article_published_time":"2025-04-25T14:32:20+00:00","article_modified_time":"2025-11-03T14:57:30+00:00","og_image":[{"width":1200,"height":900,"url":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres.jpg","type":"image\/jpeg"}],"author":"Johanna","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Johanna","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/#article","isPartOf":{"@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/"},"author":{"name":"Johanna","@id":"https:\/\/energipole.com\/en\/#\/schema\/person\/e60fd15cee4f5029eda89cdc7b9594c4"},"headline":"Before \/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me","datePublished":"2025-04-25T14:32:20+00:00","dateModified":"2025-11-03T14:57:30+00:00","mainEntityOfPage":{"@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/"},"wordCount":163,"publisher":{"@id":"https:\/\/energipole.com\/en\/#organization"},"image":{"@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/#primaryimage"},"thumbnailUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres.jpg","articleSection":["Energipole Rem\u00e9diation"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/","url":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/","name":"Before \/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me | Energipole","isPartOf":{"@id":"https:\/\/energipole.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/#primaryimage"},"image":{"@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/#primaryimage"},"thumbnailUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres.jpg","datePublished":"2025-04-25T14:32:20+00:00","dateModified":"2025-11-03T14:57:30+00:00","description":"Energipole Remediation secures the LOMA brownfield in Loriol-sur-Dr\u00f4me for ADEME: 11,330 tonnes of waste treated, 50% recovered in under four months.","breadcrumb":{"@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/#primaryimage","url":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres.jpg","contentUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/10\/Loriol-apres.jpg","width":1200,"height":900},{"@type":"BreadcrumbList","@id":"https:\/\/energipole.com\/en\/before-after-an-industrial-wasteland-transformed-in-loriol-sur-drome\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/energipole.com\/en\/"},{"@type":"ListItem","position":2,"name":"Before \/ After: an industrial wasteland transformed in Loriol-sur-Dr\u00f4me"}]},{"@type":"WebSite","@id":"https:\/\/energipole.com\/en\/#website","url":"https:\/\/energipole.com\/en\/","name":"Energipole","description":"","publisher":{"@id":"https:\/\/energipole.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energipole.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/energipole.com\/en\/#organization","name":"Energipole","url":"https:\/\/energipole.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energipole.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/08\/ENERGIPOLE-dark.svg","contentUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/08\/ENERGIPOLE-dark.svg","width":1,"height":1,"caption":"Energipole"},"image":{"@id":"https:\/\/energipole.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/be.linkedin.com\/company\/energipole"]},{"@type":"Person","@id":"https:\/\/energipole.com\/en\/#\/schema\/person\/e60fd15cee4f5029eda89cdc7b9594c4","name":"Johanna"}]}},"_links":{"self":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts\/72331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/comments?post=72331"}],"version-history":[{"count":2,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts\/72331\/revisions"}],"predecessor-version":[{"id":72333,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts\/72331\/revisions\/72333"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/media\/71983"}],"wp:attachment":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/media?parent=72331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/categories?post=72331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/tags?post=72331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}