{"id":72877,"date":"2025-12-04T12:53:14","date_gmt":"2025-12-04T11:53:14","guid":{"rendered":"https:\/\/energipole.com\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/"},"modified":"2025-12-05T13:05:43","modified_gmt":"2025-12-05T12:05:43","slug":"fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard","status":"publish","type":"post","link":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/","title":{"rendered":"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard)"},"content":{"rendered":"<p>Energipole Remediation has completed its intervention on behalf of ADEME, as part of the Prefectural Order for Office Works (APTO) dated December 5, 2020, aimed at securing and rehabilitating the Green Pack industrial site (75,210 m\u00b2).<\/p>\n<p>The mission was to characterize, package, and remove the hazardous waste present at the former industrial site.<br \/>\nThe work commenced on May 12, 2025, and was finalized on September 24, 2025, with between 12 and 20 personnel engaged depending on the phase.<\/p>\n<p><iframe loading=\"lazy\" title=\"Fin de mission pour Energipole Rem\u00e9diation sur le site Green Pack (Bosc-le-Hard, 76)\" width=\"1080\" height=\"608\" src=\"https:\/\/www.youtube.com\/embed\/r4prSWPsjoE?feature=oembed&#038;enablejsapi=1&#038;origin=https:\/\/energipole.com\"  allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture; web-share\" referrerpolicy=\"strict-origin-when-cross-origin\" allowfullscreen><\/iframe><\/p>\n<p>A project with very high constraints as it faced several major technical and safety challenges<br \/>\nobstacles\u2026<br \/>\nissues\u2026<br \/>\ndifficulties\u2026<br \/>\nhurdles\u2026<br \/>\nproblems\u2026<br \/>\ncomplications\u2026<br \/>\n:<br \/>\n&#8211; Unstable buildings<br \/>\n&#8211; Presence of asbestos<br \/>\n&#8211; Presence of pits<br \/>\n&#8211; Proximity to residents<br \/>\n&#8211; Hazardous waste<\/p>\n<p>What we accomplished<br \/>\n\u2022 Installation on site and operation of a 50-ton weighbridge<br \/>\n\u2022 Securing the old industrial process<br \/>\n\u2022 Asbestos removal work in subsections 3 and 4<br \/>\n\u2022 Stabilization of unstable superstructures<br \/>\n\u2022 Investigation and management of all underground networks on the site<br \/>\n\u2022 Pumping, cleaning, degassing, and dismantling of tanks<br \/>\n\u2022 Characterization, reconditioning, and evacuation to approved treatment facilities of hazardous waste<\/p>\n<p>Results: 1,276 tons of hazardous waste, solid, paste-like, and liquid, managed in accordance with regulations, including 25 tons of pure acid safely reconditioned.<\/p>\n<p>A project carried out safely, on a complex industrial site, with a dedicated team and reinforced, controlled protocols.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Energipole Remediation has completed its intervention on behalf of ADEME, as part of the Prefectural Order for Office Works (APTO) dated December 5, 2020, aimed at securing and rehabilitating the Green Pack industrial site (75,210 m\u00b2). The mission was to characterize, package, and remove the hazardous waste present at the former industrial site. The work [&hellip;]<\/p>\n","protected":false},"author":8,"featured_media":72874,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"video","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[44],"tags":[],"class_list":["post-72877","post","type-post","status-publish","format-video","has-post-thumbnail","hentry","category-energipole-remediation-en","post_format-post-format-video"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard) | Energipole<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard) | Energipole\" \/>\n<meta property=\"og:description\" content=\"Energipole Remediation has completed its intervention on behalf of ADEME, as part of the Prefectural Order for Office Works (APTO) dated December 5, 2020, aimed at securing and rehabilitating the Green Pack industrial site (75,210 m\u00b2). The mission was to characterize, package, and remove the hazardous waste present at the former industrial site. The work [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/\" \/>\n<meta property=\"og:site_name\" content=\"Energipole\" \/>\n<meta property=\"article:published_time\" content=\"2025-12-04T11:53:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-05T12:05:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/energipole.com\/wp-content\/uploads\/2025\/12\/Capture-decran-2025-12-05-a-12.51.02.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"634\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Johanna\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Johanna\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/\"},\"author\":{\"name\":\"Johanna\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/person\\\/e60fd15cee4f5029eda89cdc7b9594c4\"},\"headline\":\"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard)\",\"datePublished\":\"2025-12-04T11:53:14+00:00\",\"dateModified\":\"2025-12-05T12:05:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/\"},\"wordCount\":224,\"publisher\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Capture-decran-2025-12-05-a-12.51.02.jpg\",\"articleSection\":[\"Energipole Rem\u00e9diation\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/\",\"url\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/\",\"name\":\"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard) | Energipole\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Capture-decran-2025-12-05-a-12.51.02.jpg\",\"datePublished\":\"2025-12-04T11:53:14+00:00\",\"dateModified\":\"2025-12-05T12:05:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/#primaryimage\",\"url\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Capture-decran-2025-12-05-a-12.51.02.jpg\",\"contentUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/12\\\/Capture-decran-2025-12-05-a-12.51.02.jpg\",\"width\":1200,\"height\":634},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/energipole.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard)\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/energipole.com\\\/en\\\/\",\"name\":\"Energipole\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energipole.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#organization\",\"name\":\"Energipole\",\"url\":\"https:\\\/\\\/energipole.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ENERGIPOLE-dark.svg\",\"contentUrl\":\"https:\\\/\\\/energipole.com\\\/wp-content\\\/uploads\\\/2025\\\/08\\\/ENERGIPOLE-dark.svg\",\"width\":1,\"height\":1,\"caption\":\"Energipole\"},\"image\":{\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/be.linkedin.com\\\/company\\\/energipole\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energipole.com\\\/en\\\/#\\\/schema\\\/person\\\/e60fd15cee4f5029eda89cdc7b9594c4\",\"name\":\"Johanna\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard) | Energipole","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/","og_locale":"en_US","og_type":"article","og_title":"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard) | Energipole","og_description":"Energipole Remediation has completed its intervention on behalf of ADEME, as part of the Prefectural Order for Office Works (APTO) dated December 5, 2020, aimed at securing and rehabilitating the Green Pack industrial site (75,210 m\u00b2). The mission was to characterize, package, and remove the hazardous waste present at the former industrial site. The work [&hellip;]","og_url":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/","og_site_name":"Energipole","article_published_time":"2025-12-04T11:53:14+00:00","article_modified_time":"2025-12-05T12:05:43+00:00","og_image":[{"width":1200,"height":634,"url":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/12\/Capture-decran-2025-12-05-a-12.51.02.jpg","type":"image\/jpeg"}],"author":"Johanna","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Johanna","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/#article","isPartOf":{"@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/"},"author":{"name":"Johanna","@id":"https:\/\/energipole.com\/en\/#\/schema\/person\/e60fd15cee4f5029eda89cdc7b9594c4"},"headline":"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard)","datePublished":"2025-12-04T11:53:14+00:00","dateModified":"2025-12-05T12:05:43+00:00","mainEntityOfPage":{"@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/"},"wordCount":224,"publisher":{"@id":"https:\/\/energipole.com\/en\/#organization"},"image":{"@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/#primaryimage"},"thumbnailUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/12\/Capture-decran-2025-12-05-a-12.51.02.jpg","articleSection":["Energipole Rem\u00e9diation"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/","url":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/","name":"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard) | Energipole","isPartOf":{"@id":"https:\/\/energipole.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/#primaryimage"},"image":{"@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/#primaryimage"},"thumbnailUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/12\/Capture-decran-2025-12-05-a-12.51.02.jpg","datePublished":"2025-12-04T11:53:14+00:00","dateModified":"2025-12-05T12:05:43+00:00","breadcrumb":{"@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/#primaryimage","url":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/12\/Capture-decran-2025-12-05-a-12.51.02.jpg","contentUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/12\/Capture-decran-2025-12-05-a-12.51.02.jpg","width":1200,"height":634},{"@type":"BreadcrumbList","@id":"https:\/\/energipole.com\/en\/fin-de-mission-pour-energipole-remediation-sur-le-site-green-pack-bosc-le-hard\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/energipole.com\/en\/"},{"@type":"ListItem","position":2,"name":"End of mission for Energipole Remediation at the Green Pack site (Bosc-le-Hard)"}]},{"@type":"WebSite","@id":"https:\/\/energipole.com\/en\/#website","url":"https:\/\/energipole.com\/en\/","name":"Energipole","description":"","publisher":{"@id":"https:\/\/energipole.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energipole.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/energipole.com\/en\/#organization","name":"Energipole","url":"https:\/\/energipole.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energipole.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/08\/ENERGIPOLE-dark.svg","contentUrl":"https:\/\/energipole.com\/wp-content\/uploads\/2025\/08\/ENERGIPOLE-dark.svg","width":1,"height":1,"caption":"Energipole"},"image":{"@id":"https:\/\/energipole.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/be.linkedin.com\/company\/energipole"]},{"@type":"Person","@id":"https:\/\/energipole.com\/en\/#\/schema\/person\/e60fd15cee4f5029eda89cdc7b9594c4","name":"Johanna"}]}},"_links":{"self":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts\/72877","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/users\/8"}],"replies":[{"embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/comments?post=72877"}],"version-history":[{"count":1,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts\/72877\/revisions"}],"predecessor-version":[{"id":72878,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/posts\/72877\/revisions\/72878"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/media\/72874"}],"wp:attachment":[{"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/media?parent=72877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/categories?post=72877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energipole.com\/en\/wp-json\/wp\/v2\/tags?post=72877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}