Ten months of work to bring an industrial site back to life
Ten months of intensive works were required to secure and rehabilitate a long-abandoned industrial site in Feignies (Nord).
A major project led by Energipole Remediation, combining technical expertise, strict safety standards and strong environmental commitment.
Technical and exemplary operations
- Structural reinforcement prior to works
- Management of 7,000 tonnes of hazardous waste, repackaged and removed, 60% recovered for energy generation
- Demolition of a building at risk of collapse
- Treatment of 27 contaminated water pits, up to 50 m³ each
- Off-site management of two 40 m³ underground tanks
- Pilot testing on the treatment of asbestos-containing wastewater
- Social partnership with a local reintegration company
- Eight full-time personnel mobilised throughout the project
- Material recovery: 40 tonnes of paper/cardboard and 150 tonnes of wood recycled
A complex and rewarding site
“A complex but fascinating project. We witnessed a complete transformation of this site. It’s extremely rewarding for the whole team to see the final result.” Thibaut Bataille, Project Manager, Energipole Remediation